Stairway to Nowhere
So far this week, its been somewhat too cold for bricklaying, therefore no real change to the appearance of the house since the photos at the weekend.
Hopefully, it is going to warm up again by the end of the week, and they can continue with the bricks.
The builders, however, have kept busy – the interior walls in the cellar are now finished, and they have tidied up (not that it was particularly untidy even before they did!) both inside and out.
We also now have wooden staircases going both up to the first floor and down to the cellar.
We went up the stairs to have a look, but of course, the first floor is not there yet. Just a concrete floor, but no walls!
We had a quick talk with the builders, who were also having their lunch break, and they confirmed that the roof is coming tomorrow.
I had thought that they needed to build the walls up further before that, but no, the wooden joists sit on top of the ground floor, and the gaps get filled in afterwards.
Hopefully, we will have some pictures tomorrow.
Construction Dates
Begin (Groundwork) | 7th November 2016 |
---|---|
End (Handover) | 19th April 2017 |