Sockets, Light Switches and Diggers

We visited the house this afternoon to ventilate it, but no need as lots of work was going on and most of the windows were already open.

Inside, the electricians are back and have been installing sockets and light switches.

Outside, more work was going on. The diggers were at work burying the neighbours rainwater tank which has been installed today. We talked quickly to one of the digger drivers who told us that they will be starting with our groundwork on Monday (connection to waste water, rain water and installation of the rainwater tank).

 

Construction Dates

Begin (Groundwork)7th November 2016
End (Handover)19th April 2017