Kitchen v1.0

Today we have been sitting in the sun and thinking about the design for the kitchen, taking inspiration from the show-house in Ostbevern.

Thanks to the online kitchen planner from Nolte, we now have a sketch to work with.

We are still not decided about the wall units, and in particular, whether we should leave the left-hand will with no units or not.

Construction Dates

Begin (Groundwork)7th November 2016
End (Handover)19th April 2017